Asphalt Paving
Residential & Commercial Service


We pave driveways, roads, parking lots, warehouses, acreages and more! It doesn’t matter where in Western Canada you are, we can serve you from our Calgary or Winnipeg office.

 
 

Asphalt Paving Service

Serving Calgary, Winnipeg And Surrounding Communities For Over 15 Years




Ram Paving Ltd: Western Canada’s Family Asphalt Paving Company

Family Owned & Operated

Ram Paving Ltd is a Family owned and operated asphalt paving firm that has been in the industry for over three generations! This shows that we know what we’re doing, as our three generations of experience in business speaks for us.

We use only the highest standard of material and service in our asphalt paving projects, so our customers receive the best quality asphalt paving possible.

Extensive Experience

Our experience is unparalleled in the industry! We’ve been laying asphalt for three generations now and are working on taking the family business into the fourth generation.

Environmentally Friendly

We love the environment and understand the importance of going green. So whenever possible, we make use of recycled asphalt and recycle as much of the asphalt that we tear up as possible.

The Asphalt Paving Process


Before we can start the paving process, we need to prepare the project site. Any existing asphalt, concrete or paved products are demolished, and if possible recycled.

Asphalt Demolition

Step One

Demolition and Removal

The start of every asphalt paving project is the removal of existing asphalt, concrete or paving stones. Once removed, the asphalt and concrete is taken to a recycling planet where it will be processed and used again in future projects. Ram Paving Ltd is an environmentally friendly company, we are dedicated to recycling as much used product as possible.

Fixing a Garage Door

Step Two

Sub-base Prep

The most crucial step in the asphalt paving process is preparing the sub-base. It is important that this step is done properly as it is the support for the new pavement. It creates a barrier that helps reduce winter damage due to moisture freezing and thawing.

Garage Door Repair is Complete!

Chemdawg

Step Three

Grading And Sloping

Once the project area has been cleared, the area that is to be paved will be graded to have water drainage off the sides or bottom. When done correctly, water drainage helps prevent asphalt from cracking, heaving or collapsing.

Garage Door Repair is Complete!

Chemdawg

Step Four

Compacting

To get rid of any soft spots, the area to be paved needs to be compacted. This is typically done with the use of a twin drum roller.

Garage Door Repair is Complete!

Chemdawg

Step Five

Application Of Binding Layer

The base soil is then covered in a binding layer of crushed rock, that will be packed into the subsoil.

Garage Door Repair is Complete!

Chemdawg

Step Six

Asphalt Laying

Fresh asphalt is then laid over the binding layer. For residential driveways we typically create a 2 inch layer, for business parking lots it is 3 inches.

Request A Quote On Your Paving Project


Why Choose Ram Paving Ltd?


SERVICE


We live to serve! And our goal is to give you the best service possible anywhere. We believe in treating everyone we come across with respect and this shows every time you interact with anyone of our employees.


    Experience


    Our experience is unparalleled in the industry! We’ve been laying asphalt for three generations now and are working on taking the family business into the fourth generation.


      Up To Date Experts


      We keep our employees up to date on the latest safety rules and techniques through year-round continuing education. Our technicians are not just experts, but they’re up-to-date experts.

        The Environment


        We love the environment and understand the importance of going green. So whenever possible, we make use of recycled asphalt and recycle as much of the asphalt that we tear up as possible.

        Request A Quote On Your Paving Project


        Asphalt Paving FAQ

        Is Ongoing Maintenance Required?

        It is recommended to apply a new seal coating every 3 – 5 years. Crack repair should be done on an ongoing basis

        How Long Does The Process Take?

        Every project is different, but on average it takes between 2 – 3 days start to finish.

        How Long Will The Asphalt Last?

        With minimal maintenance, your asphalt pavement will last an average of 15 years. With regular maintenance and repair of cracks, it can last up to 30 years.  These estimates do not consider unusual weather or disasters such as flooding.

        How Much Does Asphalt Cost?

        Each paving project will vary in cost, as the larger the surface that needs to be paved the more asphalt will be required. As we purchase all of our asphalt from local suppliers, cost will also be influenced based on current market price.


        Calgary Office

        71 Masters Link SE
        Calgary, AB, T3M 2N2

        Hours

        M - F: 8:00 am - 5 pm


        Winnipeg Office

        23-845 Dakota St #320
        Winnipeg, MB R2M 5M3

        Hours

        M - F: 8:00 am - 5 pm